Realizations
MINERAL WATER FACTORY
Gorzanów
Category of facility | Warehouses | |
---|---|---|
Type of hall | Warehouse | |
Industry | Mineral water production | |
The total area of | 1.920 m2 | |
Implementation year | 2015 |
The scope of worked performed by the MCM Project:
- design documentation of the steel structure of the hall, hall foundations
- delivery and assembly of steel hall structure
- supply and installation of roof cladding and hall walls
- delivery and assembly of hall equipment (gates, doors, docks with loading houses)
- delivery and assembly of the electrical installation
- as-built documentation of the hall
- laying foundations
- construction of an industrial floor with a ramp and a loading ramp