Realizations
STARY BROWAR KOŚCIERZYNA
Kościerzyna
Category of facility | Production and storage halls | |
---|---|---|
Type of hall | Production and storage hall | |
Industry | Beer industry | |
The total area of | 2.490 m2 | |
Implementation year | 2015 |
The scope of work performed by the MCM Project:
- Design documentation of the steel structure and hall foundations
- Delivery and assembly of steel hall structure
- Delivery and assembly of roof cladding and hall walls
- Delivery and assembly of hall equipment
- As-built documentation of the hall