Realizations
Aliplast Sp. z o.o.
Lublin
Category of facility | Warehouses | |
---|---|---|
Type of hall | Warehouse | |
The total area of | 5.028 m2 | |
Implementation year | 2017 |
The scope of work performed by the MCM Project:
- Construction project of the hall structure with crane beams
- Detailed design of the hall structure with crane beams
- Detailed design of the hall foundations
- Delivery of foundation anchors for the steel structure of the hall
- Delivery and assembly of a steel hall
- Delivery and assembly of additional 3 frames in the B2, C1, D1 axes
- Supply and installation of crane beams
- Delivery and assembly of hall equipment (gates, doors, smoke dampers, smoke curtains, roofs)
- Disassembly of the structure and wall housing in axis 1 between axes 42 and E
- As-built documentation of the hall