ARTBET SP. Z o.o.
Piekary

ARTBET SP. Z o.o.
Piekary

Category of facility Warehouses
Type of hall Warehouse
The total area of 900 m2
Implementation year 2017

The scope of work performed by the MCM Project: 

Completion of the hall construction project to obtain a building permit in the scope of:

  • Architecture design of the hall and PZT
  • Steel structure design for the hall
  • Design of the foundation of the hall
  • Internal electrical installation design
  • Design of the electrical connection to the existing network on the investor's plot
  • Rainwater sewage system design with an evaporation tank (for fire protection)

Preparation of an executive design for the hall in the field of:

  • Design of hall foundations
  • Steel structure design for the hall

Execution of the hall, in the field of:

  • Earthworks for foundations
  • Hall foundations
  • Steel hall with accessories (doors, gates, skylight, air intakes and ventilators)