TIS Tomasz Anioł
Błonie k/Pilzna
Category of facility | Production halls | |
---|---|---|
Type of hall | Production hall | |
Industry | Welding | |
The total area of | 1827 m2 | |
Implementation year | 2019 |
The scope of work performed by the MCM Project:
a) execution of an executive design, in the scope of:
- executive design of the hall foundations
- detailed design of the hall structure
- executive design of the hall floor
b) construction of the hall in the scope of:
- earthworks for foundations and floors
- hall foundations
- prefabricated reinforced concrete columns in the hall
- steel structure of the hall with wall and roof cladding and accessories
- foundations for a C8 / 10 concrete floor, 10 cm thick
- C20 / 25 concrete floor tiles 15cm thick