Realizations
VAN BERDE SP. Z o.o.
Mielec
Category of facility | Warehouses | |
---|---|---|
The total area of | 1.350 m2 | |
Implementation year | 2017 |
The scope of work performed by the MCM Project:
- drawing up the executive design of the hall foundations;
- preparation of the assembly design for the steel hall;
- preparation, delivery and assembly of prefabricated steel hall structure elements with housing and thermal insulation of the roof and walls.